An official website of the United States government
Here's how you know
Official websites use .mil
A
.mil
website belongs to an official U.S. Department of Defense organization in the United States.
Secure .mil websites use HTTPS
A
lock (
lock
)
or
https://
means you’ve safely connected to the .mil website. Share sensitive information only on official, secure websites.
Skip to main content (Press Enter).
Toggle navigation
U.S. Central Command
CENTCOM
Search
Search CENTCOM:
Search
Search CENTCOM:
Search
Home
ABOUT US
COMMAND PRIORITIES
LEADERSHIP
COMPONENT COMMANDS
HISTORY
POSTURE STATEMENT
CENTCOM AOR
CENTCOM COALITION
OPERATIONS AND EXERCISES
USMTM
CONTACT
OPERATIONAL CONTRACT SUPPORT
COMMUNITY RELATIONS
THEATRE MEDICAL CLEARANCE
MILITARY MEMBER INNOVATION PORTAL
MEDIA
SOCIAL MEDIA
NEWS ARTICLES
PRESS RELEASES
STATEMENTS
IMAGERY
VIDEOS
TRANSCRIPTS
VISITORS AND PERSONNEL
FAMILY CENTER
FAMILY READINESS
CENTCOM WEBMAIL
SOCIAL MEDIA SECURITY
ACCOUNTABILITY
EMERGENCY PREPAREDNESS
FOIA LIBRARY
WELCOME GUIDE
CIVILIAN HARM REPORT
Home
MEDIA
VIDEOS
DVIDSVideoPlayer
Playlist:
Search Results
Video by Marisa Gaona, Desiree Kapler
Player Embed Code:
Download
Embed
Share
Port of Long Beach Ship Simulation Study - Branded
U.S. Army Corps of Engineers, Engineer Research and Development Center
Dec. 17, 2024 | 4:51
The Port of Long Beach, California, is the second busiest port in the United States. It handles more than nine-million 20-foot container units each year with cargo valued at $200 billion. Yet existing channel dimensions and tidal delays pose limitations and inefficiencies for current and future deep draft vessel traffic. To navigate the port complex, these larger vessels must carry a lighter load from their point of origin, which ultimately increases the nation’s transportation costs by requiring more ships to move cargo into and out of the complex.
In 2016, Port of Long Beach officials began to address these constraints and sought federal assistance from the U.S. Army Corps of Engineers Los Angeles District to conduct a deep draft navigation feasibility study of the port to widen and deepen its navigation channel.
To test its proposed channel design improvements, District project engineers reached out to the U.S. Army’s Watercraft and Ship Simulator, headquartered at the U.S. Army Engineer Research and Development Center (ERDC) in Vicksburg, Mississippi, to run ship simulations with pilots from the Port of Long Beach.
The feasibility study was completed in 2021 and included in the Water Resources Development Act of 2022. The project is now in the pre-construction engineering design phase, and Los Angeles District project engineers have once again sought out ERDC’s expertise in ship simulation to help verify the navigability and safety of the selected channel design. Watch to learn more.
More
Tags
navigation
USACE
Port of Long Beach
ERDC
USACE Los Angeles
Ship Simulation
More
Up Next
1:30
IWO ARG Completes ARGMEUEX
1:24
U.S. Marines Assigned to 22nd MEU Depart USS Iwo Jima During An Exercise
1:59
IWO ARG - 22nd MEU Exercises Ability to Conduct Non-combatant Evacuation Operations during ARGMEUEX
1:00
Live-Fire Exercise Onboard USS Iwo Jima
1:00
86th Annual Black Ship Festival
1:59
Sailors Onboard USS Iwo Jima Participate in a Main Space Fire Drill
1:17
NSWC Port Hueneme - Sizzle Reel
2:04
NSWC Corona Migrates COMPASS Tool to Cloud, Bolstering Shipbuilding and Saving Millions
1:12
Flight Operations Onboard USS Iwo Jima
8:15
Captain's Cabin
1:15
USNA 2025 Ship Selection Ceremony
52:58
USNS Portsmouth Naming
4:51
Port of Long Beach Ship Simulation Study - Unbranded
Now Playing
Port of Long Beach Ship Simulation Study - Branded
1:00
Ship Life 4
More Videos